PV Power Plant Gamma, Romania

Technical Due Diligence and Technical Controlling for a 50 MWp PV Power Plant

The objectives of the assignment were:

  • Identification of technical risks and development of measures for limitation and mitigation of risks
  • Management of technical acceptance including acceptance testing
  • Technical controlling

The scope of work covered the following aspects:

  • Determination of expected annual energy yield
  • Review of licenses and permits
  • Technical design review
  • Review of grid connection
  • Support in negotiation of project contracts
  • Construction monitoring
  • Verification of production numbers
  • Regular inspections of power plant (annually)
  • Consultancy in repair and budget questions
  • Assistance in warranty and insurance claims
  • Support in operational and economical improvements
  • Regular reporting to owners/banks

Technical Due Diligence and Technical Controlling for a 50 MWp PV Power Plant

Country

Romania

Year of Mandate

2014

Year of Commisioning

2013

Key Technical Data

  • Total capacity: 50 MWp
  • PV technology: poly crystalline
  • Inverter manufacturer: SMA Solar Technology
  • Grid connection: 110 kV substation incl. 8 MVA reactive power compensation
Evergy Engineering GmbH » Gamma
Dirk Zeyringer Old Hand, working @evergy since 2007
Ein Projekt an dem ich gerne mitgewirkt habe, ist der Solarpark Gamma in Rumänien. Es war für das Land eines der ersten großen Solarkraftwerke, welches an das Hochspannungsnetz angeschlossen wurde.
One project I really enjoyed working on was the Gamma solar park in Romania. It was one of the first really big solar parks to be connected to the high voltage power grid in the country.