Wind Farm Eifel, Germany

Technical Due Diligence and Technical Controlling for a 36.5 MW Wind Farm

The objectives of the assignment were:

  • Identification of technical risks and development of measures for limitation and mitigation of risks
  • Technical controlling

The scope of work covered the following aspects:

  • Determination of expected annual energy yield
  • Site suitability assessment
  • Review of licenses and permits
  • Technical design review
  • Review of grid connection
  • Support in negotiation of project contracts
  • Verification of production numbers
  • Consultancy in repair and budget questions
  • Assistance in warranty and insurance claims
  • Support in operational and economical improvements
  • Regular reporting to owners/banks

Technical Due Diligence and Technical Controlling for a 36.5 MW Wind Farm

Country

Germany

Year of Mandate

2011

Year of Commisioning

2005

Key Technical Data

  • Total capacity: 36.5 MW
  • Wind turbines: Nordex S70 + S77, Enercon E-70
  • Grid connection: 110 kV substation
Evergy Engineering GmbH » Eifel
Jens Langenbrinck windsurfer, working @evergy since 2003